Hefex Labs

    For EMS

    Make prototypes worth taking on.

    For contract manufacturers who want to be set up for the future.

    EMS

    01The problem

    Customers are won at the prototype stage.

    01

    Two hours of setup for five boards

    Retooling the series line means paid downtime, so the customer's five boards wait for a slot.

    02

    Every new part costs 30 to 60 minutes of teaching

    Nobody teaches a part for a job that may never repeat, so the customer hears "next week" or "no".

    03

    Back and forth over assembly files

    Wrong rotations, a shifted origin, an unknown package: a round of emails with the customer before the first part is placed.

    04

    The customer waits weeks for a handful of boards

    Line slot, teaching, reel order: weeks for five boards the customer needs to keep developing.

    02How Hefex solves it

    The prototype gets done, the customer stays.

    01

    Prototypes leave the production line

    Hefex runs alongside your lines and takes everything from 1 to 50 boards, the line takes everything above. Prototypes stop blocking the line, and prototyping becomes a profit center.

    02

    No component teaching at all

    Vision recognizes parts it has never seen. An unfamiliar BOM is no reason to tell a customer no.

    03

    Files in once, and it runs

    Upload the customer's files as they came; rotation, origin and unknown packages are handled by the software, even during placement.

    04

    Placed the day the parts arrive

    Setup in 5 to 10 minutes, parts fed as they came, cut tape, trays or loose, no reel to order, no slot to wait for.

    03Your unfair advantage

    A machine built for where the assembly market is heading.

    High mix, low volume

    The biggest growth in the industry, today and for the years ahead: more engineering samples, pilot runs and variants, from more customers.

    Today it ends up on the bench

    The fastest-growing assembly method is manual soldering, attributed to prototyping, low-volume work and repair.¹

    Served at a margin, and fast

    With the Etna beside the line, you quote those orders and ship them within days, while the line runs series.

    The small orders decide the series

    Customers who get five boards fast come back with five thousand. Being the EMS that serves them is the advantage.

    ¹ Global Market Insights, Printed Circuit Board Assembly Market, 2026

    Secure your unfair advantage.

    Book a demo